Chat with us, powered by LiveChat Prepare a risk workshop agenda based on the Sample Agenda for a First Risk Assessment/Two-Day Risk Workshop (Figure B-8 in Practical Project Risk Management). Include suggested time in - Writingforyou

Prepare a risk workshop agenda based on the Sample Agenda for a First Risk Assessment/Two-Day Risk Workshop (Figure B-8 in Practical Project Risk Management). Include suggested time in

 

Note:  The assignments in this course are a series of papers based on the same  case, which is on XanEdu page under the Course Information module.  The  assignments depend on one another.

Write an 8-10 page paper in which you:

  1. Identify the required pre-workshop activities.
  2. Prepare a risk workshop agenda based on the Sample Agenda for a First Risk Assessment/Two-Day Risk Workshop (Figure B-8 in Practical Project Risk Management). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case.
  3. Determine the top five threats in a risk register following the Sample Simplified Risk Register Format (Figure B-11 in Practical Project Risk Management). Include information from the case for each threat. 
    • Justify the assignment of probability and impacts for each threat identified.
  4. Document the top three opportunities in a risk register following the Sample Simplified Risk Register Format (Figure B-11 in Practical Project Risk Management). Include information from the case for each opportunity. 
    • Justify the assignment of probability and impacts for each opportunity identified.
  5. Use at least three quality resources in this assignment. Note: Wikipedia and similar websites do not qualify as quality resources.

This course requires the use of Strayer Writing Standards (SWS). The  library is your home for SWS assistance, including citations and  formatting. Please refer to the Library site for all support. Check with your professor for any additional instructions.

The specific course learning outcome associated with this assignment is:

  • Create a risk register that assesses the probability of impacts for  threats and opportunities and is informed by a risk workshop.